Some
photos taken on the Open Day Saturday February 5th
2000
Main
Building from the sports field: The new
building will be built here. It
will be linked to the main
building by a covered walkway in
place of the existing one at the
left.
Rear
View of Main Building: The downstairs classrooms
will be increased in size by
adding bay windows.
Note the red doors and window
above, added following fire
damage.